Tag Archives: traffic

Motorists can expect delays throughout San Marcos as crews work to complete important repairs in advance of the new school year

Motorists can expect delays throughout town as crews work to complete important repairs in advance of the new school year

Motorists can expect delays throughout town as crews work to complete important repairs in advance of the new school year.

Motorists are encouraged to use alternate routes, follow all traffic control, drive with caution and leave early to arrive at destinations on time.

  • Major roadway repairs requiring multiple lane closures along San Marcos Boulevard at Rancho Santa Fe Road are on schedule and will continue through Aug. 20.
  •  Caltrans construction crews will close the eastbound State Route 78 (SR-78) off-ramp to Barham Drive/Woodland Parkway for approximately 80 hours beginning Thursday, Aug. 16 at 8 pm.
  • Single lane closures along Borden Road from La Cienega Road to Palomino Drive have been scheduled from Thursday, Aug. 16 through Friday, Aug. 17 to accommodate construction improvements related to the Borden 22 project.

For details about these projects or other road work taking place in San Marcos, visit www.san-marcos.net/roadwork. Residents are encouraged to sign up for the city’s email notifications that include traffic alerts, city news, and other information updates by visiting, www.san-marcos.net/alerts.

Advertisements

Water line repair work along San Marcos Blvd. to continue beginning July 30

Beginning Monday, July 30 at 7:30 am through the late evening, motorists can expect lane closures along eastbound San Marcos Boulevard from Viewpoint Drive to Knights Realm to accommodate water line repair work by Vallecitos Water District.Both turn lanes onto southbound Rancho Santa Fe Road from westbound San Marcos Boulevard will also be closed to traffic. To access southbound Ranchos Santa Fe Road, detours will be in place directing traffic to make a U-turn at Viewpoint Drive.

Although through traffic will be maintained along San Marcos Boulevard, intermittent detours may be added throughout the construction period to help keep traffic moving.

Standard traffic control measures with advanced warning signs and pedestrian detours will be in place. Traffic delays are anticipated and motorists are encouraged to follow all traffic control measures, drive with caution through the area and use alternate routes if possible; delays in the schedule may occur.

For more information about the water line repairs, contact Vallecitos Water District at (760) 744-0460 or www.vwd.org.

To receive emailed traffic alerts or city news, sign up at www.san-marcos.net/alerts and follow the City on FacebookTwitter and Instagram using the handle @sanmarcoscity.

Mapped traffic alert for San Marcos Boulevard on July 30 

Double Peak School-City takes active approach in managing traffic safety near new school

The city takes an active approach to managing traffic safety near new school

Since the opening of Double Peak School, the City of San Marcos has taken an active approach to managing traffic safety in the area surrounding the school.

Since the opening of Double Peak School, the City of San Marcos has taken an active approach to managing traffic safety in the area surrounding the school.

“Public safety and traffic management continues to be a top priority for the City of San Marcos—especially near our schools,” said City Manager Jack Griffin.

Traffic engineers are constantly evaluating conditions along S. Twin Oaks Valley Road and have proactively implemented various traffic warning and calming measures to reduce travel speeds and the possibility of speed-related collisions.

“Knowing Double Peak School is in a challenging location when it comes to traffic management, the city has made every effort to work with the San Marcos Unified School District and enhance overall safety by using several traffic calming strategies,” said the city’s Principal Traffic Engineer Nic Abboud.

Traffic calming strategies have included the reduction of the posted speed limit from 50 miles per hour to 45 miles per hour along the northbound approach to Double Peak School.

A new traffic signal control at the school’s driveway has been installed, together with the placement of a high-visibility crosswalk. Advanced warning signs and “prepare to stop” signage have also been placed at several locations in advance of the new traffic signal, school pedestrian crossing, and steep roadway grade.

The school zone limits for 25 miles-per hour speed have been extended.  The city has installed flashing school warning signs to alert motorists of the slower speed zones.

To further encourage motorists to slow down, speed reduction bars have been placed across the lanes at decreasing intervals along the downhill approach to the school.

Motorists were also introduced to radar speed feedback signs that display a driver’s speed to help improve speed limit compliance. Traffic signal timing has also been improved to discourage red light running.

As traffic safety is driven by driver education, traffic engineering, and traffic enforcement, the city has worked in partnership with the San Diego County Sheriff’s Department to boost its speed enforcement in the area, especially during peak times.

In addition to these efforts, the city has prepared a “safe routes to school” plan that identifies the safest routes for students to follow when heading to or from the school campus. This plan has been provided to the school for implementation and parents are encouraged to share the recommended travel paths with their children.

But the city has not stopped there.

Hearing increased community concern over traffic speeds around the school and during times when children are using sidewalks, the City will retain a specialized consulting firm to evaluate innovative opportunities to address pedestrian mobility and safety issues.

Additional measures may include enhanced adoption and promotion of a “safe route to school” plan, alternative location(s) for sidewalks, implementation of additional travel speed reduction measures, and the feasibility of installing barriers or other means of protection and/or separation of pedestrians from vehicles.

While San Marcos works to evaluate these innovative opportunities, plans are already underway to install additional signage that will benefit both motorists and pedestrians. The new signs will use chevron-style arrows and raised pavement markers to alert motorist that a curve is ahead.

By partnering with the community and school district to educate parents, students and drivers along with enhanced engineering and enforcement, the city will continue working to ensure feedback provided about traffic safety issues in the area will be considered in the adoption of any new recommended solutions.

To learn more about traffic management in the city, visit www.san-marcos.net/TrafficManagement or contact the city’s traffic engineering division at (760) 744-1050. Residents can also receive email notifications about upcoming traffic alerts, city news and other programs by signing up at www.san-marcos.net/alert.

Update from The Real Families for San Marcos (Anti Brookfield development group)

Update from The Real Families for San Marcos (Anti Brookfield development group)

Have you all signed the petition for the building of 200+ townhomes past the firehouse…before the new neighborhood of Rancho Tesoro? Despite many residents fighting this during January’s meeting, city council voted for it anyway…not caring about the residents concerns. In order to stop them…we need a referendum – about 6,000 signatures the next couple weeks.

This development will attend Double Peak. Residents want concerns of traffic and overcrowded schools addressed first.

If you haven’t signed, here are some dates:
Upcoming petition hours at Starbucks (on S. Twin Oaks Valley Rd. next to Flippin Pizza)

* Mon, Feb 5, 6-8pm
* Wed, Feb 7, 6-8pm
* Wed, Feb 16, 6-8pm
* Mon, Feb 19, 6-8pm
* Wed, Feb 21, 6-8pm

Must be San Marcos resident and registered voter!

Brookfield has started their own campaign, creating fake accounts and asking for signatures to UNSIGN the petition.

__________________

READ MORE: Residents decry San Marcos housing development approval – The Coast News Group

Facebook Pages:

Pro Brookfield Homes on Twin Oaks Website & Facebook Page

Anti Brookfield Homes on Twin Oaks Facebook Page

Lane closures scheduled along Twin Oaks Valley Road beginning Dec. 11

Beginning Monday, Dec. 11, multiple lane closures have been scheduled along north and southbound lanes from N. Village Drive to Double Peak School as crews work to install underground utilities for the new Rancho Coronado housing development. Work will take place Monday through Friday from 8:30 am to 4 pm.

All lane closures are expected to be lifted by Friday, Dec. 22. Delays in the schedule may occur due to inclement weather conditions or other unforeseen conditions.

Although two-way traffic will be maintained along Twin Oaks Valley Road, traffic entering and exiting S. Village Drive may be detoured to N. Village Drive.  Traffic delays are anticipated and motorists are encouraged to use alternate routes or leave early to get to destinations on time. Flaggers may be posted to help direct traffic.

For more information, please contact Greg McDonnell with Brookfield Homes at (760) 744-0460.

Solar Project at San Elijo Elementary-Parking lot will be closed

Solar Project at SEES

Here are the details regarding our Solar Project:

The SMUSD Solar Project is ahead of schedule which means that our SEES construction for solar panel installation in our parking lot will begin this weekend, October 21.  The solar panels will be installed in our parking lot along with shade structure in front of the school at the student waiting area for drive up. There are several benefits coming both to SMUSD and SEES. If you haven’t had an opportunity to look over the resources provided by the District on our solar initiative, I encourage you to CLICK HERE to view the information on the website. You will find a short, overview video, along with more information on the process and FAQ’s.

Our parking lot will be closed for staff and visitors for 6-12 weeks.  We will need your support and patience during this time. The front of our school will have a construction fence as well for the installation of solar panel shade structure in the student waiting area.

We are working closely with Tesla, the installing solar company, to ensure that all safety precautions are

in place during construction. Our site will be staged with temporary fencing for the construction zone

prior to work commencing. All material and equipment deliveries will be coordinated to minimize impact during drop off and pick up times.

Parking:

All staff and visitors will need to park off site. There will be handicap parking available by KOC buildings.  You will need to enter from the drive up lane to access these spots.  We ask for your patience when visiting our campus during construction and parking off site. There will  be increased foot and construction traffic, and we want to make sure that everyone moves about the campus safely. Please park in designated parking spots and always use crosswalks.

Drive-up Drop off/Pick-up:

Drive up will be available for drop off and pick up for students in grades 2-5 as usual. Morning Drop-off for first grade will still be available.  There will be no drop off available for kindergarten during construction.

AM Kindergarten

  • Drop Off:  Students will enter through the KOC gate, hang their back pack up and line up by their classroom door. Students in room 601 will wait at their recess spot which is by room 103.
  • Pick-Up: Parents will enter through the KOC gate and meet their child’s class on the kindergarten playground.
  • There will be no curbside drop off for kindergarten families during construction.
  • Please leave strollers outside the kindergarten playground.

PM Kindergarten/Transitional Kindergarten

  • New Drop off time for PM only: 11:40. Please arrive prior to 11:47am for PM Kindergarten.
  • Drop Off:  Students will enter through the KOC gate, hang their backpack up and line up by their classroom door. Students in room 601 will wait at their recess spot which is by room 103.
  • Pick-Up: Parents will enter through the KOC gate and meet their child’s class on the kindergarten playground.
  • There will be no curbside drop off for kindergarten families during construction.
  • Transitional kindergarten will have regular drop-off with playground time at 11:40-11:50

1st Grade pick-up

  • First Grade families will still pick up near rolling gate. Please look for first grade pick up area which has been moved to just outside the rolling gate near the office.

Grades 2-5 pick-up

  • All students will exit to the rolling gate.
  • The back gate is still an option for those who would like to use the trails.
  • Drive-up will proceed as usual.  Drive up students will wait by the rolling gate.
  • Parents who meet their students outside the gates need to wait for students in waiting zone near kindergarten.

We anticipate taking a few days to get our new routines in place. Please allocate extra time for this transition as everyone learns our new routines.  We ask for all adults to think safety first by using crosswalks and driving cautiously.

We are excited to be part of a project that will provide savings, lesson plans, and educational materials

for all grade levels, as well as help our district go green. We will be sure to keep you updated on the

progress of our construction, but, if you have any questions or concerns, please feel free to email

solar@smusd.org.

San Marcos goes back to school -Traffic delays expected during daily commute

Traffic delays expected during daily commute

As the summer winds down, San Marcos students are headed back to school. With elementary, middle and high schools along with California State San Marcos and Palomar College back in session this week, I-15 and SR-78 travelers can expect increased traffic delays during their daily commute.

While the increase in traffic congestion is familiar to city residents, students and commuters alike, the City of San Marcos is pleased to report that continued relief is on the way. In the city’s ongoing efforts to get motorists moving and improve traffic flow, several roadway improvement projects are lined up over the next five years.

Planned projects include Improvements to the intersection of Las Posas Road and Mission Road near Palomar College and the transit center; Construction of two new bridges to replace Bent Avenue and Via Vera Cruz between San Marcos Boulevard and Discovery Street; San Marcos Boulevard and Discovery Street intersection improvements; and construction of Twin Oaks Trail north of Borden Road.

During the school year and periods of roadway construction, motorists should drive with caution in and around work areas, and provide ample time to reach destinations safely and on time.

To learn more about capital improvement projects in San Marcos, visit www.san-marcos.net/cip.

Graduation season in San Marcos

Graduation season in San Marcos

Expect traffic delays expected for the next two weekends

San Marcos, CA— Springtime in North County’s education hub means one thing—San Marcos students are getting ready to graduate.

With Cal State San Marcos hosting commencement ceremonies Friday, May 19 and Saturday, May 20 and Palomar hosting commencement on Friday, May 26, I-15 and SR-78 travelers can expect increased traffic delays around the college areas.

While the increase in traffic congestion is familiar to city residents, students and commuters alike, the City of San Marcos is pleased to report that continued relief is on the way.

In the city’s ongoing efforts to get motorists moving and improve traffic flow, several roadway improvement projects are lined up over the next five years.

Planned projects include upgrades to the Traffic Management Center (TMC)’s server and software, traffic signal equipment, as well as communication lines between the TMC and the traffic signals. In addition to improved staff and equipment response times to changing traffic conditions, these enhancements will allow traffic signals to handle more complex intersection configuration conditions.

During graduation season and periods of roadway construction, drive with caution and provide ample time to reach your destination safely and on time.

For more information about Palomar College commencement, visit www2.palomar.edu. To see Cal State San Marcos’ commencement schedule, visit www.csusm.edu/commencement.

To learn more about planned road improvements in San Marcos, contact the city’s Public Works Department at (760) 752-7550.

TRAFFIC ALERT: Nighttime road closures scheduled along San Marcos Boulevard beginning May 9th


San Marcos Boulevard between Tiger Way and Rancheros Drive will close from 8 pm to 5 am on Tuesday, May 9 and Wednesday, May 10 as crews work to overlay the intersection with asphalt concrete. Traffic on San Marcos Boulevard will be detoured via Tiger Way, Autumn Drive, Richmar Avenue and Mission Road.

Although two-way traffic will be maintained along Twin Oaks Valley Road and nighttime hours will minimize impacts to motorists, traffic delays are anticipated and motorists are encouraged to use alternate routes during the work period. Standard traffic control measures with advanced warning signs and detour directions will be in place.

Delays in the schedule may occur due to inclement weather conditions.

For more information, contact the city’s Public Works Department at (760) 752-7550. To receive automatic traffic and roadwork updates, register for the city’s email notifications by visiting www.san-marcos.net/alerts.

Median work and new traffic signal installation for S. Twin Oaks Valley Road to begin Jan. 17

Beginning Tuesday, Jan. 17 through early March, motorists can expect north and southbound single-lane closures along S. Twin Oaks Valley Road between State Route 78 and San Marcos Boulevard to accommodate median work and installation of a new traffic signal.

Daytime work will take place Monday through Friday from 9 am to 2 pm with overnight work scheduled Sunday through Thursday from 9 pm to 5 am. Delays in the schedule may occur due to inclement weather conditions.

Although two-way traffic will be maintained along S. Twin Oaks Valley Road, traffic delays are anticipated and motorists are encouraged to use alternate routes during the work period.  Standard traffic control measures with advanced warning signs and pedestrian detours will be in place.

For more information, contact the city’s contracted project’s superintendent Chuck McLaughlin with Watkins Landmark  at (858) 342-1851.

« Older Entries